A quotation is a firm fixed price, not a rough guess. Build yours below with a valid until date and an acceptance line your client can sign. The totals and tax are calculated for you, the preview updates as you type, and the PDF is free to download.
How to write a quotation that holds up
Fix the scope first
A fixed price needs a fixed scope. List exactly what is included, line by line, so there is nothing to argue about later.
Set the valid until date
Thirty days is typical. After that date you are free to reprice, which protects you when supplier costs move.
Get it signed
The acceptance line at the bottom is not decoration. A signed quotation is the record both sides point to if memories differ.
A worked example
A design studio quotes a bakery on a rebrand and a new website. The price is fixed, tax is 10 percent, and the offer holds for 30 days.
| Line item | Qty | Unit price | Amount |
|---|---|---|---|
| Brand identity package | 1 | $1,800.00 | $1,800.00 |
| Website design and build | 1 | $3,200.00 | $3,200.00 |
| Menu and packaging design | 1 | $750.00 | $750.00 |
| Subtotal | $5,750.00 | ||
| Tax, 10 percent | $575.00 | ||
| Quotation total, fixed | $6,325.00 | ||
That total is the deal. If the bakery signs inside the validity window, the studio does the listed work for $6,325, even if its own costs creep up in the meantime. That certainty is exactly what the client is buying, and why a quotation carries more weight than an estimate.
Estimate or quotation: the honest difference
People use the two words as if they were the same document. They are not, and mixing them up costs businesses money.
An estimate is approximate by design. It says the job should land near this figure, and it leaves room to adjust when reality turns out different. A quotation removes that room. The price is fixed, the scope is fixed, and the only open question is whether the client accepts before the valid until date.
Use an estimate early, when you are still learning the job. Switch to a quotation when you know enough to commit. Sending a firm quote on a fuzzy job, or a vague estimate when the client needs certainty, are the two mistakes this page exists to prevent.
How long should a quotation stay valid?
Thirty days is the default most businesses land on, but it is not the right answer for every job. The window should match two things: how fast your own costs move, and how long your client genuinely needs to decide.
| Situation | Typical validity |
|---|---|
| Everyday services with stable costs, cleaning, design, repair work | 30 days |
| Work priced off materials that swing, timber, metals, imported goods | 7 to 14 days |
| Bigger jobs a client has to approve through a manager or a committee | 45 to 60 days |
| Seasonal work booked well ahead | A fixed date, with material prices reconfirmed at booking |
When the date passes, the offer simply lapses. You are free to reprice at today's costs, and there is no awkward negotiation about it, because the document said so from the start. Send a fresh quotation with a new number rather than extending the old one in an email.
What acceptance actually commits you to
When a client accepts a quotation, in most places the accepted document and its terms become the basis of the agreement between you. That cuts both ways, and it is worth knowing exactly where the edges are.
It commits you to the listed work at the listed price, inside the validity window. It commits the client to pay that price for that work. If your costs rise after acceptance, that is normally your problem, not theirs. That is the deal a fixed price makes.
It does not commit you to anything that is not written down. Extra work, upgraded materials and a changed specification all sit outside the accepted quotation until they are agreed separately. It also does not hold the price open after the valid until date, or for a different client, or for a second job at the same address.
One caution for work sold to consumers in their home: some jurisdictions give the customer a cooling-off period after signing, during which they can cancel. Check the rules where you trade, and let the acceptance line carry the date as well as the signature, so the timeline is never in doubt.
Revisions, variations and deposits
Jobs change. The rule that keeps changes painless is simple: never edit an accepted quotation. If the client asks for more, issue a variation or a revised quotation that references the original number, and get it accepted before the extra work starts. A revision suffix keeps the trail obvious: Q-2041 for the first version, Q-2041-R1 for the revised one.
Deposits belong in the terms at the same time. For custom or made-to-order work, 30 to 50 percent on acceptance is common, because you are committing money to materials before you can bill anything. On the worked example above, 30 percent of $6,325 is $1,897.50 on acceptance, with $4,427.50 left to pay on completion. For standard work from stock, a smaller deposit or none at all is normal.
When the job finishes, invoice against the quotation total and show the deposit as already paid. The client should be able to line the invoice up against the signed quotation and see that the numbers match, line for line.
Quotation generator FAQs
What is a quotation, in plain terms?
A quotation is a written promise: this work, for this price, valid until this date. Unlike an estimate, the price does not drift. If the client accepts within the validity period, you are both working to the number on the page.
Estimate vs quote: which one should I send?
Send an estimate when the scope is still fuzzy and the price honestly might change, like repair work where you cannot see the damage yet. Send a quote when you know the job well enough to fix the price and stand behind it. Many businesses estimate first, then quote once the details are pinned down.
How long should a quotation stay valid?
Thirty days is the common default. It gives the client time to decide while protecting you from material price rises. For fast-moving prices, 14 days is reasonable. Whatever you choose, the valid until date on the document is what counts, so set it deliberately.
What does the acceptance signature line do?
It turns a price into an agreement. When the client signs and dates the acceptance line, both sides have a record of exactly what was agreed and at what price. It will not replace a full contract on a big job, but for everyday work it settles most disputes before they start.
Is this quotation generator free?
Yes. Creating and downloading quotations costs nothing and needs no account. The downloaded PDF carries a small footer line crediting DraftFolio, which is the whole business model at this stage.
What happens after a client accepts my quotation?
Keep the signed copy with the job paperwork, take any deposit your terms ask for, and invoice against the quoted total when the work is done. If the client later asks for extra work, quote that separately rather than quietly absorbing it.